Temporary works for concrete bridges
There are many different temporary works solutions used in concrete bridge construction. Their design and installation needs to interact with permanent works. A key aim is to provide permanent works designers with an understanding of temporary works and how these influence their design.
Knowing the constraints on the design and construction due to the permanent works should allow contractors and temporary works designers to develop a safe and practical range of different temporary works for concrete bridges.